Home News Lagos Airport Runway to be Closed for Repairs
News

Lagos Airport Runway to be Closed for Repairs

Share
Lagos Airport Runway to be Closed for Repairs | Daily Report Nigeria
Share
  • The Federal Airports Authority of Nigeria (FAAN) has announced the temporary closure of Runway 18R/36L at Murtala Muhammed International Airport, Lagos.
  • The closure, scheduled for March 3 and 4, 2025, is for further rehabilitation work on the runway.
  • The alternative runway 18L/36R will be in active use during the period.

The Federal Airports Authority of Nigeria (FAAN) has announced the temporary closure of Runway 18R/36L at Murtala Muhammed International Airport, Lagos, for further rehabilitation work.

The closure, scheduled for March 3 and 4, 2025, comes just two weeks after the runway was reopened following an almost 11-month maintenance shutdown.

According to a memo dated February 28, 2025, from FAAN’s Head of Operations, Mrs. J.U. Nwosu, the closure is necessary due to the rehabilitation work (asphalt phase) at A2 Taxiway-link of the runway.

ATTENTION: Click HERE to join our WhatsApp group and receive News updates directly on your WhatsApp!

READ ALSO: Police Gun Down 4 Kidnappers on Lagos-Ibadan Expressway

“It is considered necessary to close the runway due to the protruding construction equipment which may likely become a potential hazard to any landing and departing aircraft,” the memo reads.

The alternative runway 18L/36R will be in active use during the period. FAAN has advised all technical departments to constantly inspect facilities to ensure everything is in place, including grass management, security, and 24-hour surveillance.

“It is pertinent to know that all the measures associated with total runway closure will be applied hence, adequate facility protection is necessary,” the memo adds.

2 Dead, Others Injured, As Truck Rams Into Cars In Lagos

A collision along Sagamu-Ikorodu Expressway has claimed two lives, leaving several other injured.

Daily Report Nigeria gathers that the accident happened after DAF truck suffered a brake failure on Saturday night, along the expressway.

Continue Reading Here

Share

Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Articles
EFCC May Release VeryDarkMan Today | Daily Report Nigeria
News

EFCC May Release VeryDarkMan Today

The Economic and Financial Crimes Commission (EFCC) is expected to release social...

Peter Obi reacts to ‘alarming UTME results’, urges urgent education reforms | Daily Report Nigeria
News

Peter Obi reacts to ‘alarming UTME results’, urges urgent education reforms

Fomer presidential candidate Peter Obi has expressed deep concern over the 2025...

Rivers Community Hit by Fresh Oil Spill: Vandals Suspected of Causing Devastating Leak | Daily Report Nigeria
News

Rivers Community Hit by Fresh Oil Spill: Vandals Suspected of Causing Devastating Leak

A fresh oil spill occurred in Ikata community, Ahoada-East local government area...

Atiku Presents BVAS, PVCs as Evidences Before Tribunal
News

Atiku Slams Tinubu Administration Over VeryDarkMan’s Detention

Former Vice President Atiku Abubakar condemned the arrest and detention of social...